Services

Datacenter Design & Build

Grid2Chip approach to design and build datacenter is based on client's current requirements & future growth, uptime requirement of IT application, scalable architecture and the space selected for datacenter. G2C unique approach is refurbishing the existing datacenters to reduce power consumption based on latest IT trends like server consolidation, cloud computing and virtualization.


The present challenge that IT heads & CIOs are facing is " the IT Hardware load getting reduced & power consumption losses are increasing day by day", even this is applicable for growing organizations, this is due to disruptive technologies like Cloud Computing and IT consolidation.


The server consolidation is driven by most of the CIOs as the IT application downtimes are directly proportional to number of hardware assets. The physical infrastructure like UPS, PAC, Fire alarm systems …etc failures, cause very minimal impact on applications uptimes when compare to hardware or software issues. As most of the customers have taken care on physical infrastructure with multiple redundancies considering the contingences while building datacenters.


We redefine datacenter design & build considering the current business dynamics "bringing PUE as close as to unity" thus increases the operational savings without compromising on IT application availability.


Our capabilities are
Design & built new datacenters on signed PUE  
Power Quality Audit for existing datacenters  
DPR on power analysis and present PUE (Power Utilization Efficiency)  
Solutions to increase PUE in existing datacenters  
Datacenter maintenance & support  
24/7 support on penalty based SLAs  


We believe in value creation, "we sign contracts of DC built on committed power efficiency" to increase operational savings to our customers.